Share

Word of mouth is the best publicity we can get. So please take a second to tell friends and family about our website.

Recent Reviews
« New self-catering cottage: Upstairs progress | Main | Collateral Damage »
Monday
Jan172011

We have lift-off

It’s been a while, but we have a really good excuse. Here it is:

new-cottage-rear-view.jpg

We are about to begin a full renovation of the old concierge’s cottage. For the past couple months Virginie has been arm-wrestling contractors, slashing red tape and herding bankers. We finally have all our ducks in a row. The estimates are signed and the first checks have been cut. Work is scheduled to begin in early February and last 2 months. And that doesn’t count decoration and furnishing. 

Starting from less than scratch

The cottage has been unoccupied for over two decades. There’s no power, but luckily there is water. The roof is happily in great shape, but the inside is a mess.  To weatherproof it, just after Christmas we installed the new windows. To help us see clearly, we ripped out all the fixtures and fittings and demolished some non-load bearing walls. This is the kind of thing we’re facing:

new-cottage-living-area.jpg

To get an idea of where we’re starting from, here’s a collection of “before” photos.

The aim is to end up with a 3-bedroom, two-bath self-catering cottage. Wish us luck!

 

Reader Comments (1)

Hello Richard,
Congratulations on the Lift-off! Now we don't want to hear anything like: "Housten, we've got a problem!" :-)

January 26, 2011 | Unregistered CommenterLeo SIMONS

PostPost a New Comment

Enter your information below to add a new comment.

My response is on my own website »
Author Email (optional):
Author URL (optional):
Post:
 
Some HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>